ATLASPAVERSOUTDOOR CONSTRUCTION
← Portfolio

West 33rd Avenue

Patios · 2025

Side patio rebuild with two-tone slate pavers, charcoal soldier course, and a low retaining wall to lift the garden bed.

West 33rd Avenue after

Before

West 33rd Avenue before

Quick facts

Surface area
~620 sqft
Pavers
Slate grey + charcoal
Wall
Smooth-face block, 24 in
Build time
11 days

Notes

Old concrete side patio cracked along the foundation line and pitched the wrong way, tracking water toward the basement window for years.

Demo'd everything to native, dropped a deeper base over geotextile, and laid two-tone slate pavers in a running bond with a charcoal soldier course around the perimeter. Stepped landing off the back door rebuilt to match.

Garden bed retained with a 24-inch smooth-face block wall so the planting beds sit clean above the patio elevation. Pitch reset to fall away from the house.